Second generation onboard system
The aim of the project is to develop and implement an improved sea state estimation procedure. The following topics have been identified as most important:
- Dynamic selection of ship responses to be used in the sea state
- Check for faulty signals
- Inclusion of fatigue damage estimations in the operational criteria
- Power prediction estimates based on semi-empirical formulas and proper estimation of added resistance in waves
The project should results in an on-board software system able to run real time on a standard PC and using input from standard sensors like accelerometers and strain gauges.
The expected starting date is 1 August 2010.



